The plan, not a completion report.
Nine departments. Eight repository groups. 33 new repositories, counted and not named. Phases 0 through 4. The same public facts as the systems page, in one place.
This page repeats the public plan. The machine-readable copy is registry.json. It does not name repositories or list dependencies.
Phases 0 through 4
Five numbered phases, over 26 weeks. Planned. Dates and week-by-week scope are still to come.
- PlannedPhase 0
Clarity before code
- PlannedPhase 1
Foundation
- PlannedPhase 2
Ops rails + cores
- PlannedPhase 3
Growth, doc, security cores
- PlannedPhase 4
Studio and infrastructure
33 new repositories
The count is 33 new repositories across these eight groups. Planned. Individual repository names are not on this page.
- 01
AAIS Commons
No department of the same name.
- 02
Agentic Systems
One of the eight groups. A group is not the same list as a department.
- 03
Dealer Technologies
One of the eight groups.
- 04
ServiceLane Growth
This name also sits on the department list.
- 05
DocSense
One of the eight groups.
- 06
Blackwall/VeilTrace
Blackwall and VeilTrace share this group.
- 07
Odd Duck/Sitecraft
Odd Duck Labs and Sitecraft Studio share this group.
- 08
Holdings IT
One of the eight groups.
Nine departments
These names are how the studio is organized. They are a roster, not a staffing or shipping report. Departments and repository groups are different lists.
- Blackwall
- VeilTrace
- Asbury Dealer Technologies
- Agentic Systems Inc
- ServiceLane Growth
- DocSense AI
- Odd Duck Labs
- Sitecraft Studio
- AAIS Holdings IT
Read the map, then talk.
The architecture page is the longer explanation. Bring a workflow if you want the plan held against it.