Skip to content
ASBURYAI SOLUTIONS Start a project
Planned / 26 weeks

The plan, not a completion report.

Nine departments. Eight repository groups. 33 new repositories, counted and not named. Phases 0 through 4. The same public facts as the systems page, in one place.

This page repeats the public plan. The machine-readable copy is registry.json. It does not name repositories or list dependencies.

01 / Phases

Phases 0 through 4

Five numbered phases, over 26 weeks. Planned. Dates and week-by-week scope are still to come.

  1. PlannedPhase 0

    Clarity before code

  2. PlannedPhase 1

    Foundation

  3. PlannedPhase 2

    Ops rails + cores

  4. PlannedPhase 3

    Growth, doc, security cores

  5. PlannedPhase 4

    Studio and infrastructure

02 / Groups

33 new repositories

The count is 33 new repositories across these eight groups. Planned. Individual repository names are not on this page.

  1. 01

    AAIS Commons

    No department of the same name.

  2. 02

    Agentic Systems

    One of the eight groups. A group is not the same list as a department.

  3. 03

    Dealer Technologies

    One of the eight groups.

  4. 04

    ServiceLane Growth

    This name also sits on the department list.

  5. 05

    DocSense

    One of the eight groups.

  6. 06

    Blackwall/VeilTrace

    Blackwall and VeilTrace share this group.

  7. 07

    Odd Duck/Sitecraft

    Odd Duck Labs and Sitecraft Studio share this group.

  8. 08

    Holdings IT

    One of the eight groups.

03 / Departments

Nine departments

These names are how the studio is organized. They are a roster, not a staffing or shipping report. Departments and repository groups are different lists.

Next

Read the map, then talk.

The architecture page is the longer explanation. Bring a workflow if you want the plan held against it.